
Centenary Bridge (Manchester Ship Canal)

There is a lift bridge here which takes a major road over the canal.
Barton Low Level Bridge | 1 mile, 7½ furlongs | |
Barton Swing Bridge | 1 mile, 1¾ furlongs | |
Barton Swing Aqueduct Overhead | 1 mile, 1½ furlongs | |
Irwell Park Wharf | 5½ furlongs | |
Cerestar Wharf | 2 furlongs | |
Centenary Bridge (Manchester Ship Canal) | ||
Sewage Works | 3¾ furlongs | |
Weaste Wharf | 4¼ furlongs | |
Mode Wheel Locks | 7¾ furlongs | |
Media City Footbridge | 1 mile, 1¾ furlongs | |
Dock No 9 Entrance | 1 mile, 2¼ furlongs |
Why not log in and add some (select "External websites" from the menu (sometimes this is under "Edit"))?
Mouseover for more information or show routes to facility
Nearest water point
In the direction of Woden Street Footbridge
Nearest rubbish disposal
In the direction of Woden Street Footbridge
Nearest chemical toilet disposal
In the direction of Woden Street Footbridge
Nearest place to turn
In the direction of Woden Street Footbridge
Nearest self-operated pump-out
In the direction of Woden Street Footbridge
Nearest boatyard pump-out
In the direction of Woden Street Footbridge
Wikipedia has a page about Centenary Bridge
The Centenary Bridge is a motorway crossing of the Brisbane River. As it forms part of Brisbane's Centenary Motorway, it is used primarily by vehicular traffic, although it includes footpaths for pedestrian traffic.
Built to service the new Centenary Suburbs of Jindalee, Mount Ommaney and Westlake, the original two lane bridge opened in 1964. It was financed by the developers of the suburbs, LJ Hooker.
The bridge was duplicated as part of an upgrade of the Centenary Highway and Western Freeway south of Mount Cootha Road. The works were officially opened by Russell Hinze, Minister for Main Roads, on 27 March 1987.
During the 1974 floods, the bridge was badly damaged when a barge rammed into its upstream side. The barge blocked the flow of floodwaters under the bridge and there were real fears that the bridge would collapse. The barge was deliberately holed using explosives and allowed to sink to reduce the floodwater pressure on the bridge. When the floodwater receded, the barge was refloated and beached downstream near Fig Tree Pocket to be cut up for scrap. The damage sustained by the bridge required its partial closure for repairs. For two years after the floods, the bridge was reduced to a single lane, with one way traffic controlled by traffic lights at each end of the bridge.