Facilities: diesel for sale, gas for sale and boatyard pump-out.
There is a bridge here which takes a minor road over the canal.
Winding Hole above Bunbury Locks | 2 furlongs | |
Former Bunbury Stables | ½ furlongs | |
Bunbury Staircase Locks Nos 30 and 31 | ¼ furlongs | |
Bunbury Lock No 31 Tail Bridge | a few yards | |
Bunbury Bridge No 105 | ||
Bunbury Railway Bridge No 105A | ¾ furlongs | |
Tilstone Visitor Moorings | 5¼ furlongs | |
Tilstone Lock No 32 | 5¾ furlongs | |
Tilstone Mill Bridge No 106 | 6 furlongs | |
Beeston Stone Lock Visitor Moorings | 1 mile, 3½ furlongs |
Amenities nearby at Bunbury Lock No 31 Tail Bridge
Why not log in and add some (select "External websites" from the menu (sometimes this is under "Edit"))?
Mouseover for more information or show routes to facility
Nearest water point
In the direction of Winding Hole above Bunbury Locks
In the direction of River Dee Branch Junction
Nearest rubbish disposal
In the direction of Winding Hole above Bunbury Locks
In the direction of River Dee Branch Junction
Nearest chemical toilet disposal
In the direction of Winding Hole above Bunbury Locks
In the direction of River Dee Branch Junction
Nearest place to turn
In the direction of Winding Hole above Bunbury Locks
In the direction of River Dee Branch Junction
Nearest self-operated pump-out
In the direction of Winding Hole above Bunbury Locks
In the direction of River Dee Branch Junction
Nearest boatyard pump-out
In the direction of Winding Hole above Bunbury Locks
In the direction of River Dee Branch Junction
Wikipedia has a page about Bunbury Bridge
Bunbury Bridge was a single-track, timber railway bridge in East Perth in Western Australia. The bridge crossed the Swan River near Claise Brook and was built for passenger and freight traffic to Bunbury on the South Western Railway, and was also part of the Armadale railway line.
The Bunbury Bridge (then called the Swan Bridge) was built in 1892 by Atkins and Law. Construction was delayed due to troubles with sinking the jarrah piles into the soft riverbed: they were intended to be sunk 42 feet (13 m) below the water level, but reached this depth under their own weight as soon as they were put in position. Ultimately, they had to be driven to 85 to 96 feet (26 to 29 m) before a solid footing was found.
The bridge was opened as part of the Perth to Bunbury Railway, which was officially opened on 8 September 1893 by Governor Robinson. Following concerns for its safety, a so-called "temporary" replacement bridge was built between 1930 and 1932.
After 63 years of use, the temporary structure was closed when a new concrete railway bridge opened in 1995. The old timber bridge was demolished in early 1996. The 1995 concrete dual-track Goongoongup Bridge was built as part of the electrification of Perth's suburban railways. Windan Bridge (opened April 2000) is immediately adjacent and carries road traffic from the Graham Farmer Freeway.