There is a bridge here which takes a railway over the canal.
Delamere Dock Entrance | 1 mile, ½ furlongs | |
Weston Point Salt Works (ICI) | 1 mile, ¼ furlongs | |
Runcorn Lay-by | 7½ furlongs | |
Runcorn Docks | 4½ furlongs | |
Bridgewater Canal Junction (closed) | 3 furlongs | |
Runcorn Railway Bridge | ||
Widnes Bridge | ¼ furlongs | |
Old Quay Lock | 3¼ furlongs | |
Old Quay Swing Bridge | 6¼ furlongs | |
ICI Wharf (General Chemicals) | 1 mile, ½ furlongs | |
Astmoor Wharf | 1 mile, 6 furlongs |
Amenities nearby at Widnes Bridge
Why not log in and add some (select "External websites" from the menu (sometimes this is under "Edit"))?
Mouseover for more information or show routes to facility
Nearest water point
In the direction of Mersey - Ship Canal Junction
Nearest rubbish disposal
In the direction of Mersey - Ship Canal Junction
Nearest chemical toilet disposal
In the direction of Mersey - Ship Canal Junction
Nearest place to turn
In the direction of Mersey - Ship Canal Junction
Nearest self-operated pump-out
In the direction of Mersey - Ship Canal Junction
Nearest boatyard pump-out
In the direction of Mersey - Ship Canal Junction
Wikipedia has a page about Runcorn Railway Bridge
The Runcorn Railway Bridge, Ethelfleda Bridge or Britannia Bridge crosses the River Mersey at Runcorn Gap between Runcorn and Widnes in Cheshire, England. It is alongside the Silver Jubilee Bridge. The bridge is recorded in the National Heritage List for England as a Grade II* Listed building.
In 1861, Parliamentary approval for a railway crossing the Mersey was obtained by the London and North Western Railway (LNWR). The design for a bridge and viaducts was produced by William Baker, the company's chief engineer. In 1863, preparatory work for the bridge and approach viaducts commenced. The bridge was completed in 1868 and was opened for traffic on 10 October. The first goods traffic crossed the bridge on 1 February 1869 and the first passenger train on 1 April.
The bridge has received few alterations. In 1965, the pedestrian footway alongside the railway was closed to the public but retained for maintenance access. The bridge is used by rail traffic on the Liverpool branch of the West Coast Main Line. The lines are electrified and 25 kV AC overhead lines installed. Starting in the 2010s, the bridge has undergone a lengthy maintenance programme that will extend its life for another 150 years.