Canalplan Bug Tracker



Anonymous Login
2017-10-23 20:08 BST

View Issue Details Jump to Notes ]
IDProjectCategoryView StatusLast Update
0000323Canalplan [All Projects] Bugpublic2017-09-30 11:27
ReporterShultzy 
Assigned ToNick Atty 
PrioritynormalSeverityminorReproducibilityalways
StatusresolvedResolutionno change required 
PlatformMicrosoftOSWindowsOS Version8.1
Product VersionProduct Build 
Target VersionFixed in Version 
Summary0000323: Bridge symbols not updated
DescriptionI've noticed that some/all bridge types across the system have not updated to the new symbols, in particular footbridges but there may be other symbol types. Compare [Wathen Wigg Bridge], a newly added bridge, which has the dotted green line; with the older [North Bank Footbridge] which does not.
TagsNo tags attached.
Attached Files

-Relationships
+Relationships

-Notes

~0001311

Nick Atty (administrator)

The difference there is that Wathen Wigg Bridge carries "a footpath" but North Bank Footbridge carries "pedestrian traffic".

I think this is a real distinction between an official footpath and - say - a lock bridge for boaters. Whether it's applied consistently is a different matter of course.
+Notes

-Issue History
Date Modified Username Field Change
2017-09-15 12:08 Shultzy New Issue
2017-09-20 19:08 Stephen Atty Assigned To => Nick Atty
2017-09-20 19:08 Stephen Atty Status new => assigned
2017-09-30 11:27 Nick Atty Status assigned => resolved
2017-09-30 11:27 Nick Atty Resolution open => no change required
2017-09-30 11:27 Nick Atty Note Added: 0001311
+Issue History